Home Page
About Us
Request a Quote
Contact Us
Case Studies
Useful Links
Brick Arches
Special Shaped Brick Cutting
Faststack™ GRP Chimney Systems
Kevington Fastwall™ Brick Wall Panels
Certification applies to MBP products Certificate No. 00/3674 Certificate No. 99371
Website created by Into Reality - Site Map
Latest news: Kevington launches new brick wall panel system Kevington Fastwall™
Kevington Chimney Installation Procedure - Link to PDF version for printing
1. Delivered to site ready for pointing (on the ground)
2. Crane into position on the trusses using the lifting eyes and loops supplied
3. Drill through support plates and screw to the trusses using the fixings provided.
4. Batten over the support plate as shown.
5. Tile the roof
6. Apply the supplied sealant to the channel before and after flashing
7. The lead is then dressed securely into the flashing channel
8. The lifting eye plugs must be sealed into the lifting eyes to finish